150+Meta sites delivered
876Endpoints per site
0Defects at turnover
60%Less manual testing
Where I've worked.
Tap a tile to learn more.
Things I've built.
The toolkit.
Hover for details.
Structured cabling
OTDR
Fiber testing
Loss budgets
Troubleshooting
Standards
CCNA
MOPs / SOPs
Python
SQL
Flask · React
Test automation

Education
Master's. 3.94 GPA.
- 2024M.S. Information Technology Management, Lindsey Wilson
- 2022B.Tech Computer Science, VIT
- CertsCCNA · OSHA 10 · ANSI (in progress)
Network Infrastructure Engineer
- Delivered 150+ end-to-end connectivity deployments with zero-defect acceptance at Meta NOC turnover.
- Owned each site from BOM/EDP validation and procurement through rack commissioning and sign-off.
- Validated 876 endpoints per site: singlemode, multimode, MPO, AOC/DAC, and copper.
- Authored MOPs and SOPs aligned with TIA-568, BICSI, and NEC.
- Audited installs and tracked vendor fixes to closure with Meta, Ericsson, and partners.
- Restored failed links through loopbacks and Layer 1 isolation with Meta NOC.
- Supported live refreshes for AI/HPC infrastructure.
Infrastructure & QA Automation Engineer
- Cut manual regression effort 60% across 5 modules with Cypress and C# suites.
- Raised end-to-end coverage from 72% to 89%.
- 95% pre-release defect resolution across 150+ defects, with SQL data checks.
Every link, measured
A link that lights up isn't the same as a link that passes. Each one is tested and documented against its loss budget before turnover.
Fiber Link Health Monitor
Ingests OTDR exports, classifies each link pass/fail against loss thresholds, and flags failing links and loss trends on a dashboard built for high-density cluster turn-up.
MOP & SOP library
Written procedures for installation, testing, and live-environment cutovers, so every crew on every concurrent site works the same way.
Site to sign-off
- BOM and EDP validation before install
- Weekly materials forecasting and procurement
- Construction coordination and multi-site sequencing
- Rack commissioning and as-built documentation
- Turnover packages and NOC acceptance